  • Suitable for almost all rigid substrates and applications such as industrial floors, commercial and production facilities, warehouses, sterile floor areas, etc.
  • Applied as a roller coating
  • Results in a glossy finish. The floor texture remains visible after coating
  • Consumption: Primer with EP Coating approx. 350 g/m², coating with EP Coating approx. 350 g/m²
  • Walkable / recoatable after approx. 16 hrs, fully load-bearing after approx. 7 days (at +20 °C)

Instructions for Use

chevronBottom

Prepare substrate:

The substrate must be load-bearing, dry, sufficiently tensile and compressive strength, and clean. Dust, oil, grease and release agents must be removed in advance using suitable methods (preferred method: shot blasting; alternatively diamond grinding with thorough vacuuming).
Application should be carried out at 10-30 °C (room and substrate temperature) and a maximum relative humidity of 70 %.

Apply EP Coating in two layers:

  1. EP Coating is applied in two layers. Approx. 350 g/m² should be planned per layer. Fresh material must be mixed for each layer. At 20 °C, the second layer may be applied no earlier than 16 hours and no later than 36 hours after application of the first layer.
    Important: If the second layer is not applied within 36 hours, the first cured layer must be sanded until it is completely matt (white haze) before the second layer can be applied.
  2. For mixing, pour the complete contents of EP Coating component B into the container of EP Coating component A. Then add 2 × 100 g of EP Colour Paste and mix slowly and thoroughly with a drill for approx. 3 minutes at 300-400 rpm. 
    Working Time: approx. 30 minutes at 20 °C.
  3. Immediately after mixing, pour the material onto the floor, spread it with a surface squeegee and then roll over it to achieve an even surface and retain the floor texture.
  4. During curing, protect the area from moisture, dust and mechanical stress.
    Walkable after approx. 16 hours, fully load-bearing after approx. 7 days (temperature-dependent).

Important Notes

chevronBottom

Colour deviations are possible due to raw material variations. When using different batches, base components should be pre-mixed. UV radiation and weathering may cause slight colour changes. To avoid curing and mixing problems, components A and B must first be thoroughly mixed, then transferred into a second clean container and mixed again.

Warning

chevronBottom

Danger Causes skin irritation. Causes serious eye irritation. May cause an allergic skin reaction. May damage fertility. Toxic to aquatic life with long lasting effects. Harmful if swallowed. Harmful if inhaled. Causes severe skin burns and eye damage. Harmful to aquatic life with long lasting effects. Contains epoxy constituents. May produce an allergic reaction. Corrosive to the respiratory tract. The information on the product label must always be followed.