  • Suitable for almost all substrates and applications such as rigid industrial floors, commercial and production facilities, warehouses, sterile floor areas, etc.
  • Applied as a self-levelling coating
  • Results in an even, seamless, mirror-smooth, high-gloss surface
  • Consumption: primer with EP Primer approx. 330 g/m², coating with EP Industry approx. 1,800 g/m²
  • Walkable after approx. 16 hours, fully load-bearing after approx. 7 days (at +20 °C)

Application Instructions

chevronBottom

Prepare substrate:

The substrate must be level, load-bearing, dry, sufficiently tensile and compressive strength, and clean. Dust, oil, grease and release agents must be removed in advance using suitable methods (preferred method: shot blasting; alternatively diamond grinding with thorough vacuuming). Application should be carried out at 10-30 °C (room and substrate temperature) and a maximum relative humidity of 70 %.

Apply EP Primer:

  1. For mixing, pour the complete contents of EP Primer component B into the container of EP Primer component A and mix slowly and thoroughly with a drill for approx. 3 minutes at 300-400 rpm. 
    Working Time: approx. 40 minutes at 20 °C.
  2. Immediately after mixing, pour the material onto the floor, spread it with a rubber squeegee and then roll over it to achieve an even surface and retain the floor texture.
  3. During curing, protect the area from moisture, dust and mechanical stress. Walkable after approx. 14 hours, fully load-bearing after approx. 7 days (temperature-dependent).
  4. Subsequent coating with other products may be applied at 20 °C no earlier than 14 hours and no later than 36 hours after application of the EP Primer. 
    Important: If the subsequent coating is not applied within 36 hours, the EP Primer must be broadcast with quartz sand while still fresh/liquid (recommended amount: approx. 300 g/m²). Before applying the next coating, any loose excess quartz sand must be removed with a broom.

If required: level unevenness (surface roughness) greater than 0.5 mm with EP Levelling Compound:

  1. For mixing, pour the complete contents of EP Levelling Compound component B and 10 kg of quartz sand into the container of EP Levelling Compound component A and mix slowly and thoroughly with a drill for approx. 3 minutes at 300-400 rpm. 
    Working Time: approx. 30 minutes at 20 °C-
  2. Immediately after mixing, pour the mixture onto the floor, spread it evenly with a surface squeegee and then deaerate with a spiked roller to achieve an even surface and a smooth finish.
  3. During curing, protect the area from moisture, dust and mechanical stress. Walkable after approx. 15 hours, fully load-bearing after approx. 7 days (temperature-dependent).
  4. Subsequent coating with EP Industry may be applied at 20 °C no earlier than 15 hours and no later than 36 hours after application of EP Levelling Compound. 
    Important: If EP Industry is not applied within 36 hours, the EP Levelling Compound must be broadcast with quartz sand while still fresh/liquid (recommended amount: approx. 500 g/m²). Before applying the EP Industry coating, any loose excess quartz sand must be removed with a broom.

Apply EP Industry main coating:

  1. For mixing, pour the complete contents of EP Industry component B into the container of EP Industry component A. Then add 2 × 100 g EP colour paste and mix slowly and thoroughly with a drill for approx. 3 minutes at 300-400 rpm. 
    Working Time: approx. 35 minutes at 20 °C.
  2. Immediately after mixing, pour the mixture onto the floor, spread it evenly with a notched squeegee and then deaerate with a spiked roller to achieve an even surface and a mirror-smooth finish.
  3. During curing, protect the area from moisture, dust and mechanical stress. Walkable after approx. 16 hours, fully load-bearing after approx. 7 days (temperature-dependent).

Important Notes

chevronBottom

Colour deviations are possible due to raw material variations. When using different batches, base components should be pre-mixed. UV radiation and weathering may cause slight colour changes. To avoid curing and mixing problems, components A and B must first be thoroughly mixed, then transferred into a second clean container and mixed again.

Danger

chevronBottom

Causes skin irritation. Causes serious eye irritation. May cause an allergic skin reaction. May damage fertility. Toxic to aquatic life with long lasting effects. Harmful if swallowed. Harmful if inhaled. Causes severe skin burns and eye damage. Harmful to aquatic life with long lasting effects. Corrosive to the respiratory tract. Contains epoxy constituents. May produce an allergic reaction. The information on the product label must always be followed.

piktogram-ausrufezeichen-fisch-reagenzglas-giftlunge.png

reviews

Related Products